ØProject Introduction: The project site is located at a mixing site in a high-altitude grassland. The diesel generator supplies power to the two mixers, the boiler and the mixer control room, and the operation of the diesel generator requires a large amount of fuel consumption, which also brings environmental pollution to the prairie and noise pollution to the workers living in the project site. According to the actual situation of the site, we proposed a solution for the customer's diesel-storage hybrid power supply system, which can provide a stable power supply for the operation of the mixer and the control room, and reduce fuel consumption to the extreme through the hybrid control strategy, so as to achieve the effect of pollution reduction and carbon reduction.
ØLocation/Time: Sichuan, China, June 2024
ØConfiguration:PCS: 400kW,BAT:430kWh.
ØLoads: mixers, control rooms, boilers
ØOperating environment: dusty, 3600m above sea level
ØOperation mode: the system runs off-grid, the diesel generator is used as the power source, the energy storage is used as the energy allocation center, and the control system intelligently judges and controls the start and stop of the diesel engine.
ØValue embodiment:
1.The real-time response of the diesel-storage hybrid system perfectly solves the power demand of the load;
2.The power supply system is intelligent, the power supply system is unattended, and the mobile terminal monitors the operation status of the system;
3.Reduced electricity costs, reduced pollution, and lower carbon emissions;
4. The living environment of the staff and local residents has been improved.